04
June
Engineering 2K S.p.A. and BLS s.r.l. (Building Life Cycle Service) have chosen Elysium covering system for the new Leroy Merlin structure, built in Castel San Giovanni (PC): a high-tech warehouse, thanks to the high level of automation, the total led lighting, the thermal insulation and to the BMS system for the automated control of the working areas in terms of lighting, ventilation and security.
Even in this construction, it has been particularly appreciated the simplicity of the operations during laying of Elysium, which have allowed to reduce the installation time.
They have chosen the Elysium 574 Aluzinc plates with a thickness of 6.10 mm, entirely produced at Elysium srl in Cadoneghe (PD).
To watch the video shot with the drone click here!
For photos go to the case history!